Early Production System

The Early Production System is a small scale project designed to produce IBE’s first hydrogen for the domestic transport market. The project, located a short distance from Perth, has been envisioned to kick start the development of an end-user market for hydrogen through a fast tracked hydrogen production schedule. The project will be powered by renewable energy sources and will have up to 10MW of electrolyser capacity with a nameplate production capacity of 4.4 tonnes of hydrogen per day. IBE expect first gas to be produced in 2023.

Project Details

  • 10MW of electrolyser capability
  • Carbon offset of transport markets
  • First gas by 2023
Back